Tuesday, May 19, 2009

May 19, 2009: Electrical Rough ins Done, Heating / Cooling Begin

We didn't make it out to the site on Monday, but did on Tuesday. Some more work had been done on the shingles, plumbing, heating / air, and the electrical rough-ins are now "finished".

View of the house from the tree on the north east corner. Most of the shingling is done now.


View of the shingles on the back of the great room.

Electrical rough-ins on the outside were also completed. This one is next to the garage door.

Preethi inspects some of the cans for recessed lighting in the great room. More cans have been hung in the back.

Cans for recessed lights in the kitchen. There's two over the sink, two over the range, and two over the kitchen desk. (You can only see two in this photo).

Stair light rough-ins. Effectively night lights so you don't fall down the steps.

The huge set of wires that will go into the electrical panels in the basement.

Pipes for water for a bath/shower. Hot and cold are mixed and sent up the single pipe.

View in the shower/bath. Still need to add some fixtures (faucet, shower head).

A different view of a shower where you can see the water pipe extending above the the top of the surround for the shower head.

Underneath a shower rough-in.

Tubes that will eventually be filled with freon to connect a compressor with an air handler (we're dual-zone).

Cold-air intake on the main floor situated on the side of the pantry closest to the dining room (for the lower zone).

Cold air-intake at the top of the stairs (for hte upper zone).

3 vents in the master bedroom. On the top floor, the vents will be in the ceiling as the air handler will be in the attic.

WIth the vents, plumbing, and electrical rough-ins in, it's starting to crowded in a few places.

View of the registers in another upstairs bedroom from a closet. You can also see a wire hanging down that will eventually power a fluorescent light.

On the main level, the vents are currently on the floor. However, we wanted them off the floor to cut down on the amount of dog hair that falls into the ducts.
View of the main level vents from the basement,
More of the freon-filled (eventually) tubing that connect air handlers and compressors. One of the air handlers will be in the basement.

Fritz checked out the basement on his own.

Silver verified that the silt fence had been fixed after last week's storms.