Friday evening, we visited the lot with James and Kate. The bricks had finished off on the main east gable and the main north gable and had started on the entryway. Much more drywall had been hung as well. At this point, the remaining only remaining drywall to be hung appears to be in the master bedroom and in one of the upstairs bedrooms.

View of the house from the tree on the northeast corner of the lot. The white boxish looking thing is a gable vent that was added. There will be a matching one on the other side of the house.


Preethi and Kate step out onto the front porch. Bricks columns were added which will support arches.

Looking up the stairs where a bit of drywall was hung.

Preethi and Kate inspect the kitchen, which had the last part of the drywall hung.

Drywall in the laundry.
Kate inspects a closet in an upstairs bedroom.

Preethi steps into master bathroom.

Preethi stands in front of the throne room in the master bathroom.

View of the walls in the stairwell on the second level.