Saturday, June 20, 2009

June 19, 2009: Bricks, roof, and drywall

Due to travel, Friday was the first chance I had to visit the house in about a week. During that time, the bricks were finished (except for the front steps which have to wait on the ground to settle as they’re not on the foundation), the shingles were finished, the last of the dry wall was hung with two courses of mudding and taping (one more course to go, then sanding), and the last air handler was installed in the basement.
View of the house from near the Northwest corner. The front porch with its two arches was completed. The arch is kind of a repeated design element as we replicated that launch angle of the arch in the arch that divides the kitchen from the great room. The cinder blocks you see are used because they’re cheaper and will either be below grade or covered with steps.

View from the driveway. The last part of the shingles that needed to be installed were the portions where the brick walls extend above a roofline. If you look closely, you can see the brick step flashing which is one of the various things added to either keep or vent water out from behind the brick.

View of the west gable where you can see the gable vent and where the shingles meet the brick.

Close up view of the brick flashing above the front entrance.

The airhandler in the basement (zone 2).

Some of the duct work in the basement.

Preethi walking up the stairs in the basement. We like the open stairs landing we have in our current townhouse and carried over that element to the new house.


Looking up the stairs into a bedroom.


One of the bedrooms on the second level.


Preethi walking into the master bedroom.
View of a bedroom on the second floor.

View of the great room.
View of the East attic gable vent through the opening to the attic.

Yet more dirt delivered for backfilling in around the foundation (think cinder blocks).