Thursday, September 3, 2009
September 3, 2009: Last Concrete Poured
On Thursday, we went out to the house during lunch (no pics) while they were pouring concrete and then much later in the evening when the concrete was done.
Preethi looks at the sidewalk. The lines in the concrete are regularly spaced control joints.
Preethi looks at the sidewalk. The lines in the concrete are regularly spaced control joints.
Labels:
air handler,
apron,
concrete,
garage stoop,
master bathroom,
Preethi,
sidewalk
Monday, August 31, 2009
August 31, 2009: Plumbing Fixtures
Monday was a busy day at the house. Preethi had been by during lunch and said there were 6 trucks there, which is believable as plumbing work, concrete prep, painting, and the culvert pipe installation were done.
The pedestal sink on the main floor bathroom. We thought the space was a little tight so we used a pedestal sink instead of a normal vanity.
Toilet on the main floor bathroom. (I'm not posting every picture of every toilet). There was water in the toilet, but water had not been hooked up to the house yet. I figure the water was there to a) check for leaks, and b) cut down on septic gas flowing back into the house (not that there should be that much yet...)
The laundry room wash basin (some assembly required).
Faucet for the sink in the Jack and Jill bathroom. One of the things that annoys me about the current house are the faucets do not extend out far enough. This means I tend to bump my hands against the back of the sink when I'm washing my hands.
The throne in the throne room.
Hot water heater was installed today.
The faucet on the kitchen sink.
Labels:
apron,
concrete,
garage stoop,
paint,
pedestal sink,
plumbing,
rebar,
sidewalk,
sink,
throne room,
toilet
Friday, August 28, 2009
August 28, 2009: Forms for concrete
We dropped by the house Friday after work. Some forms for were completed and the hot water heater was delivered.
Labels:
apron,
concrete,
forms,
garage stoop,
sidewalk,
water heater
Tuesday, August 25, 2009
August 25, 2009: Concrete and Water
On Tuesday, we made it out to the house shortly after work. They've begun hooking up the water to the house, some concrete was poured and drainage pipes were placed in trenches.
And this is where the water will go into the house.
A bunch of plumbing tubes.
The concrete was poured to support the front steps.
The concrete piers that will help support the backdoor garage stoop. Dirt will fill in around the piers (dirt has a way of receding over time and if there isn't the concrete support the pad by the door will eventually crack and drop off too)
Labels:
concrete,
Drainage,
garage stoop,
master bedroom,
plumbing,
water
Monday, August 24, 2009
August 24, 2009: Forms and veneer
On Monday, we visited the house shortly after work. Concrete should be poured tomorrow and forms were in place.
Forms for the piers that will support the back door garage concrete pad.
Turns out that the ridge can't be stained (the downside to engineered wood). So now we're building a fake ridge over the real ridge but using wood pieces that can be stained.

My apologies for the misrotated image. But I've rotated it, saved it and reuploaded several times and either the file save is failing or blogger is doing something weird. Regardless, a little more prep work was done on the front stoop. I assume the plastic is there to help with the curing process.
Forms for the piers that will support the back door garage concrete pad.
Turns out that the ridge can't be stained (the downside to engineered wood). So now we're building a fake ridge over the real ridge but using wood pieces that can be stained.My apologies for the misrotated image. But I've rotated it, saved it and reuploaded several times and either the file save is failing or blogger is doing something weird. Regardless, a little more prep work was done on the front stoop. I assume the plastic is there to help with the curing process.
Monday, August 17, 2009
August 17, 2009: Staining and drainfield
Over the weekend, we visited the lot and ran into Dan where we found out the drainfield wasn't actually quite done as the number of required drainage lines had doubled, so that now the builders and the survey engineer think the drain field is ridiculously overdesigned (large enough to accommadate a 8 bedroom house - it's 4 bedrooms).
However, by Monday evening, the additional lines had been dug (cheaper than fighting the state for a few months while simultaneously delaying our certificate of occupancy) and some staining had begun on the railings.
Rebar that will be used to reinforce several concrete pourings in the near future.
The stained railing. Note neither the steps nor the floor have been stained yet. That won't occur until virtually everything is done.
However, by Monday evening, the additional lines had been dug (cheaper than fighting the state for a few months while simultaneously delaying our certificate of occupancy) and some staining had begun on the railings.
Rebar that will be used to reinforce several concrete pourings in the near future.
The stained railing. Note neither the steps nor the floor have been stained yet. That won't occur until virtually everything is done.Friday, May 22, 2009
May 22, 2009: Bricks delivered, basement poured, more ducts
On Friday, the basement was poured and bricks were delivered (to start on Monday), and more ducts were run. Unfortunately, we didn't make it out on Thursday to see the rebar mesh for the basement floor.
Preethi inspects a brick (half thickness);
The pile of sand, presumably for mixing with cement, lime and what not for the mortar.
The initial pile of bricks. They're covered with plastic in anticipation of rain this weekend. (Bricks are supposed to be a little wet, but not soaked for construction)
A pile of bricks.
Cement blocks for the below grade portions.
As seen from the main level, the basement floor was poured. They had just finished smoothing (screeding I assume) when we arrived.
Looking at the basement floor from the basement door (southwest corner) back towards where the stairwell will be.
Looking across the den in the basement and the smooth floor. There's both rebar below and a vapor barrier (seen in earlier pictures)
Duct work leading from the stairwell back to where the top zone air handler will be (over the bedroom whose ceiling is not open to the roof)
Some of the ducts running in the attic.
Looking from the master bath into an adjacent (non-master) bedroom, you can see the freshly added ducts.
Close up on a duct leading into a vent.
The front door was delivered, though it won't go up for a while (don't want it damaged during the construction). It's 5' wide and 8' tall and made our of mahogony. Oddly, this was FAR cheaper than the equivalent 6'8" door made out of fir. Turns out the higher-end door is kept in stock while what should be the lower end door has to be custom made.