Thursday, August 27, 2009

August 27, 2009: Granite and front steps

On Thursday, we went to the house twice. Once during lunch to meet with the granite guys and then again in the evening to inspect the results and go on a walk. Work was also proceeding on the sidewalk and the front steps had gone in on Wednesday.

The granite in the kitchen in the evening after installation (all in). Preethi's playing "find the seam".

Your turn to find the seam. I promise it's there. What is easier to see is where the installers intentionally tore out a little drywall. Basically, the granite is perfectly straight, but drywall is not and if you'll be putting in a backsplash you can cover over the hole later.

Earlier in the installation process with the granite around the sink and dishwasher going in.


Same piece as in the preceding pic, but just after being dropped in (not yet glued and the sink has not yet been attached).

The granite around the sink post installation.

A closer view of the island. The island has a 1/4" bevel edge while the rest of the granite has a pencil edge. (granite edge types)

Another view of the installed granite in the kitchen.

We also put granite on top of fireplace. Oddly, the granite and the crown was cheaper than a traditional mantle piece.
The brickers were back installing the front steps the day before and while they were there I asked them how hard it would be to tear out some bricks rebrick a part which I thought didn't look right. (see the vertical line in the mortar in this picture). Turns out it's not that hard for the masons to knock out selected bricks and re-lay a few.

Preethi, Danny, and W.D. discuss the exact path of the sidewalk during lunch.

The sidewalk later that night. The curved wood is actually masonite.

This is mostly to see the bricked floor in the entryway. Still has to be cleaned.

Dan drops off a fresh load of dirt to build up the support around the piers that will support the garage backdoor pad.

Dirt filling in around the pillars. Eventually, the concrete blocks will be covered.

Glass samples we were considering for the cabinets. The left is "ridged" the right is "bubble". We're going with the ridged.


Tuesday, August 25, 2009

August 25, 2009: Concrete and Water

On Tuesday, we made it out to the house shortly after work. They've begun hooking up the water to the house, some concrete was poured and drainage pipes were placed in trenches.
Water beginning to be run to the house. This is the end that will connect to the water hookup.
And this is where the water will go into the house.

A bunch of plumbing tubes.

The concrete was poured to support the front steps.

The concrete piers that will help support the backdoor garage stoop. Dirt will fill in around the piers (dirt has a way of receding over time and if there isn't the concrete support the pad by the door will eventually crack and drop off too)
Concrete piers for the garage backfoor stoop viewed from the master bedroom.

Gutter drainage pipes were trenched in.

Preethi saw some dirt in the master bedroom and a push broom and couldn't resist a chance to sweep.

The attic fan in the house was running when we entered (probably kept the house cooler). And yup, it showed up on the meter. We're all the way up to 1 kWh


Monday, August 24, 2009

August 24, 2009: Forms and veneer

On Monday, we visited the house shortly after work. Concrete should be poured tomorrow and forms were in place.
Forms for the piers that will support the back door garage concrete pad.

Turns out that the ridge can't be stained (the downside to engineered wood). So now we're building a fake ridge over the real ridge but using wood pieces that can be stained.


My apologies for the misrotated image. But I've rotated it, saved it and reuploaded several times and either the file save is failing or blogger is doing something weird. Regardless, a little more prep work was done on the front stoop. I assume the plastic is there to help with the curing process.


Friday, August 21, 2009

August 21, 2009: Electricity, forms, and a little granite

On Friday, we got out to the house in the afternoon. The countertop guys had been out to template for the granite and I noticed a couple things that were probably already done that I had just missed.
Preethi inspects a granite sample the countertop guys left. We were considering using unpolished granite on the top of the mantle (for a stone mantle look) but we decided to go with a polished granite piece that will match the kitchen counter tops.

Same piece as before, but now set on the island in the kitchen.

The concrete pad for the front steps is ready to be poured. Preethi told me this happened on Thursday, but I hadn't seen it.

A different view of the drainfield with an inspection pipe for the septic tank.

See that light? It indicates a ground fault interrupt. I assume it's on because the electrician was testing its operation. But also means that the main power line is now hooked up to the house.

Our power meter was installed and reading 0 kwH. I've never owned or lived in a house that showed that. Probably won't stay there for long.


Thursday, August 20, 2009

August 20, 2009:

On Thursday, we got out to the house in the evening. The rest of the cabinets were in place and cabinet hardware had started to be installed.

A view of the slightly update cabinets. The handles on the doors are on, but the knobs on the drawers still have to be added. Also crown molding on the top of the cabinets and a shelf for the microwave was added.

Closeup of the microwave shelf.

Detail of the cabinet crown molding which was added today.

Compared to before, I don't know that the gap between the doors was adjusted much. However, Preethi spoke with the installer again today, and it turns out that we be able to adjust the doors further, which I'll do later to close the gap. Sure the doors will swell and shrink throughout the year, but cabinet doors haven't been that hard to adjust in the past.

The bifold door for the pantry was installed today.

Bifold door on the linen closet in the jack-and-jill bathroom.

Vanity on my side of the master bathroom.

Forms in the ground for the piers for the stoop on the south facing door from the garage.

The rest of the forms for the piers are currently in the garage.

Wednesday, August 19, 2009

August 19, 2009: Cabinets Mostly In

On Wednesday, we went out to the house in the evening (Preethi had been there at lunch) to inspect the cabinet installation. While we liked the colors and most of the design, there's some installation issues that need to be resolved.
View of the cabinets from the great room. Preehi is inspecting some doors (more on this later).
We just have cabinets along two walls (and the island seen here).

The microwave cabinet. That's a gigantic gap between the doors which we're not happy about at all as we got full overlay doors which per usual installation has less than 1/8" of an inch of a gap. (See here for a general discussion of cabinet door types). Here, this is well over 1/4 inch and you can see straight into the cabinet.
Unfortunately the massive gaps aren't constrained to just that one pair of doors. All of them were like this where you can clearly see straight into the cabinet.

As to the source of the problem, Preethi is leaning to issues originating with the cabinet designer as the cabinet installer said that was as close as he could get the doors. I'm leaning towards issues on the installation as cabinet doors typically have a lot room for adjustment. And while I didn't have a screwdriver with me to make the adjustments, I have seen this photo from the manufacturer of the line we bought where there are no ginormous gaps.
Regardless, it'll be a fun conversation tomorrow morning.
Preethi's vanity in the master bathroom. It looks better installed (not intended as a full overlay so there's framing between the doors) though Preethi thought there was supposed to be paneling on the right side drawers to match the paneling on the left side doors.

A vanity in the Jack and Jill (this one looks as it should).

The foyer tile was grouted today. Here's what it looks like now. We're happy with it.

Not all cabinets are in place, but most are.

Tuesday, August 18, 2009

August 18, 2009: Last of the floor tile and cabinets arrive

I went out to the lot Tuesday evening (Preethi had been there most of the morning) and snapped a few pics.

The foyer tiles. We were going for a kind of carpet look.
The foyer tile area viewed from the dining room.

And viewed from the great room.

All of the cabinets and vanities were delivered for the entire house, which means the kitchen cabinets and all the bathrooms. In theory, they're all going to be installed tomorrow, but they're certainly taking up a lot of space now; this is just the set in the great room.

Here's the cabinets in the kitchen.

More cabinets.

In the meantime, more grading was done on the back yard.

Dan was still busy grading the backyard (drain field) when I was there.

The basement railing was also stained. That probably happened earlier, but I hadn't been down to the basement.

The hole where we'll dump the bodies. Or a foundational pier for the steps. Probably the latter. Probably.