The forms are all complete, the driveway is done, and the concrete for the footers have been poured. The foundation walls (and all the exterior walls for that matter) will end up sitting on the footers and the concrete slab will be poured up to them. There's actually a bit more involved in a footer than this indicates (i.e., beyond the concrete and wood, there's a vapor barrier, mesh, gravel, and rebar for reinforcement).
Low level view of footers. On the main level, looking from back to front on the left side, bedroom4, dining room foyer, great room.
Low level view of the footers at the front of the house. Eventually, the main entrance will be about 2.5 feet off the ground.
Wilbert (who Preethi used to report to), the dogs, and Preethi (somewhat hidden by Wilbert) look at the footers. We bring people out to the lot... a lot. In fact, we like showing the lot so much, we made a blog!
At the garage looking down the slope at the back of the house. We're walking down to the stream to show Wilbert the rest of the lot.