March 27 - Forms Finish Going Up

In between the rain storms, the interior walls for the forms went up on Friday with concrete to be poured in between the forms to create the basement walls on Monday.


Forms on North Side of Garage


If you look closely, you can see the rebar between the forms that will be help reinforce the concrete.


Looking southwest. The wood braces (not angled) seem to be there to help provide horizontal bracing.

Interior walls looking southwest. The walls are braced with the wood beams to hold the concrete while it cures. While the southwest side looks incomplete, it’s actually done (from a forms perspective) as the portions above ground will have framed walls rather than poured (concrete) walls which are being used below-grade (and a little bit above).