Thursday, March 12, 2009

March 10 - Forms Start

At this point the hole is completely dug out (due to the slope, it's level with the ground on the back right as viewed from the road and 7ish feet down on the front left). The forms (framing for the concrete in the footers) are going in. At this point, forms still need to be layed out for the garage and the inner trace of the forms needs to go in.

Looking at the forms from the garage entrance. That square at the top is where the main entrance will be.


Stones for the temporary driveway (so heavy equipment like the kind that carry concrete won't get stuck) where the permanent driveway will eventually lie.


Looking north-northwest from past the garage.

Mmmm... Stump pile still there. Eventually to be burned.


Preethi surveys the work.


View from the farm road looking back (northeast),


Looking down on the forms that will be below the great room and kitchen (main level). The great room is our favorite room in the house (or will be) and is what we're spending the most time on modifying the design. I've been doing some CAD modeling to help with the modifications which I'll post later.