Monday, March 23, 2009

March 21 - Some material delivered

It rained hard and then remained wet for a while so not much happened. Specifically, the wooden supports for the footers were removed. But then it looks a lot like it did before.

Footers near the entrance.

Footer detail.

Some material got delivered, though.

Perhaps the most important piece of construction equipment.

Some forms for the basement walls.

Gravel for the basement floor (concrete to be poured over the gravel)

Random pictures of the land

Since so little was done over the week, we took some random pictures of the land.

Our stream.

A bridge over our stream to our field. That's also our ridge in the back. 6.2 acres is a lot of space.

And here's a pictures of Silver (left) and Fritz (right) in the field across the bridge.

And here's Silver saying hi to Beowulf - a neighbor dog. Lots of dogs in the neighborhood. At least on our street, there's about twice as many dogs as houses.