On Friday, I went out to the house after work. The garage door was in, the hardwood had been sealed and a few things other things were done.
A doggy door was put in on the garage back door. It locks on the inside.
The garage door was installed. Wasn't operational when I was there, so this is the best picture I have.
The hardwood floors were sealed, so we can't walk on them until Monday.
However, I could peek in again at the front entrance. Here's the great room. All the sunlight reflecting off the floor is skewing the light sensors in the camera making the floor look lighter here than it actually is.
Stairs. This is a bit more representative of the color.
Great room looking towards the fireplace.
A "temporary" railing was installed on the front porch. We are thinking of doing concrete railings long term, but this looks pretty good so we might put that off for a while and maybe just stain the railing to match the door.
A close up of the condensers (dual-zone)
The freon tubes coming out to the condensers.
A close up of the condensers (dual-zone)
The freon tubes coming out to the condensers.
No comments:
Post a Comment