Tuesday, September 8, 2009

September 8, 2009: Staining and driveway begin

We made it out to the house on Monday, though not much visibly had been done (Dan was busy prepping for the seeding guy, but that was mostly smoothing out the soil). On Tuesday, however, floor staining and the driveway installation began.

The stained great room floor and stairs. The stain color is English Chestnut. This (and all the floor stain pictures) were taken leaning into the front door as we can't walk on the floor for a while.

The dining room floor.

Looking across the great room.

The driveway was graded and crushed stone began to be put down (by the garage), but then a rather large rain storm came up. Not so conveniently while I was there making a small change on a corner of the driveway.

From Monday - the ridge was stained and the dormer was painted.

The outside units for the air conditioners were installed on Tuesday (no inside pics - mud + stained floors),

On Monday, I also noticed that electrical boxes were put in on the kitchen island.

On Monday, we also took some "family" shots on the front porch. From left to right: Fritz, Preethi, Silver.

And here's Fritz, me, and Silver.