Thursday, September 3, 2009

September 3, 2009: Last Concrete Poured

On Thursday, we went out to the house during lunch (no pics) while they were pouring concrete and then much later in the evening when the concrete was done.

Preethi looks at the sidewalk. The lines in the concrete are regularly spaced control joints.


Sidewalk viewed from the driveway.
Pads for the propane tank (front) and condensers (back).
Basement stoop. Note that the smaller concrete jobs don't get control joints.


Garage stoop and apron. These have control joints.

Heat exchanger has now been wired up for the basement and main level (the other one is in the attic for the second floor.)

A little oval framing was done on the jacuzzi tub in the master bathroom

The water entry point for the house was sealed.