On Wednesday, we went out to the house in the evening. More plumbing fixtures were put in and several more electrical hook ups were made. Also, we now have a completion schedule for the house.
The most important addition - the schedule for the rest of the construction. The last thing to go in are the closet shelves on the 16th (2 weeks).
The dishwasher was installed (actually attaches to the bottom side of the granite)
The shower fixtures went in. This one is on the main level. All the shower heads are the same.
Laundry wash basin was installed. (Washer and dryer are coming from the current house, so they won't be in for a few weeks.)
Shower head in the master shower. Looks a little bit more in place here than downstairs where it looks a little over-sized.
The outlet covers were laid out for all of the outlets and switches to be installed tomorrow.