Saturday, July 4, 2009

July 3, 2009: Interrior Doors Start

On the 3rd of July, we dropped by the house in the middle of the day where Danny was in the process of finishing trimming the windows and installing doors. All of the interior doors were in place on the main level except for the pantry where the wrong door was delivered and the second level doors were about ready to install.

The coat closet door and door down to the basement viewed from the foyer. They'll be painted a white that matches the trim.

Trimmed in entrance to the kitchen from the main level hallway.

Doors in the guest bedroom. From left-to-right: entry door, bathroom door, closet doors. Our closet doors are primarily double doors for slightly easier entry.

A really tight trim joint in the main-level bathroom. Danny had to cut off a little bit of the standard trim to make them fit together.

Door on the second level waiting for installation. As you can see, they're prehung, which generally makes installation easier, except when you have to adjust the trim as in the preceding.

Matching double doors for the master closets (they come off on either side of the the hallway to the master bath that you see in the center of the photo).

ADS pipes stacked up in the garage for underground drainage from the gutters. Basically, the further downhill you can release the roof runoff water from the foundation, the happier your foundation will be.