Monday, August 24, 2009

August 24, 2009: Forms and veneer

On Monday, we visited the house shortly after work. Concrete should be poured tomorrow and forms were in place.
Forms for the piers that will support the back door garage concrete pad.

Turns out that the ridge can't be stained (the downside to engineered wood). So now we're building a fake ridge over the real ridge but using wood pieces that can be stained.


My apologies for the misrotated image. But I've rotated it, saved it and reuploaded several times and either the file save is failing or blogger is doing something weird. Regardless, a little more prep work was done on the front stoop. I assume the plastic is there to help with the curing process.