August 28, 2009: Forms for concrete

We dropped by the house Friday after work. Some forms for were completed and the hot water heater was delivered.

Forms for the sidewalk. It flares out at both the driveway and the steps.

Forms for the apron and the garage stoop.

The backfill beside the garage stoop. We'll likely need to put in a retaining wall in the not so-distant future.

The hot water heater was delivered. It will go underneath the basement steps.