Tuesday, August 25, 2009

August 25, 2009: Concrete and Water

On Tuesday, we made it out to the house shortly after work. They've begun hooking up the water to the house, some concrete was poured and drainage pipes were placed in trenches.
Water beginning to be run to the house. This is the end that will connect to the water hookup.
And this is where the water will go into the house.

A bunch of plumbing tubes.

The concrete was poured to support the front steps.

The concrete piers that will help support the backdoor garage stoop. Dirt will fill in around the piers (dirt has a way of receding over time and if there isn't the concrete support the pad by the door will eventually crack and drop off too)
Concrete piers for the garage backfoor stoop viewed from the master bedroom.

Gutter drainage pipes were trenched in.

Preethi saw some dirt in the master bedroom and a push broom and couldn't resist a chance to sweep.

The attic fan in the house was running when we entered (probably kept the house cooler). And yup, it showed up on the meter. We're all the way up to 1 kWh